Pump safety and move management technology firm Circor Pipeline Engineering has supplied a buyer with a rapid opening closure (ROC) for a 48-in gas filter vessel within 10 weeks.
เพรสเชอร์เกจ offers a fast opening entry level to pipelines or strain vessels, for the set up or removal of kit.
Built by Pipeline Engineering in Catterick, UK, the 48-in ASME U-Stamp giant ROC closure needed to be delivered to the client in Houston, Texas in 10 weeks. It was constructed and delivered on time using the model new giant Vertical Turning Center (VTC) put in in Catterick in 2020 to scale back manufacturing lead time.
Following the delivery, Pipeline Engineering provided help with set up and welding from its Houston facility.
The closure has been outfitted with the new CIRCORSmart tag for traceability, document access and straightforward buyer help when it goes into operation.
Share